Foundry 2.0 – Building the frame

I’ve started building the frame and lifting mechanism. My plan is to have the top lid rotate off for adding to the melt. The top two thirds will lift straight up to remove the crucible from the side to pour.

sm_img_0162

Leave a Reply

Your email address will not be published. Required fields are marked *